APC AR201 Ficha Técnica

Consulte online ou descarregue Ficha Técnica para Racks APC AR201. APC AR201 racks Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 2
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
2-Post Rack AR200 & AR201
990-6040A 1/2 6/00
NetShelter
®
®
Unpacking and Inspection
Before unpacking:
1. Inspect the carton for damage. If you detect damage, notify the carrier.
2. Remove the components from the carton and inspect them for shipping damage.
Note:
The mounting hardware is enclosed in a separate plastic bag located inside one of the packaging
inserts glued to the main carton. Remove it before discarding the carton.
Inventory
The following table lists the parts that are included with the NetShelter 2-Post Rack.
To o l s R e q u i r e d
You will need a 9/16" box-end wrench to assemble the rack.
Inventory of the NetShelter 2-Post Rack
Component Quantity
Rack
3" Extruded Upright Rail 2
1½" × 1½" Extruded Top Angle 2
3½" × 6" Extruded Bottom Angle 2
Hardware
3/8"-16 × ¾" Hex Head Bolt 12
3/8" Split Lock Washer 12
#12-24 Screw (for installing equipment) 24
Vista de página 0
1 2

Resumo do Conteúdo

Página 1 - NetShelter

2-Post Rack — AR200 & AR201990-6040A 1/2 6/00NetShelter®®Unpacking and InspectionBefore unpacking:1. Inspect the carton for damage. If you detect

Página 2 - Installation

2/2InstallationRefer to figures 1 and 2:1. Place the uprights on a flat surface, approxi-mately 20" apart, with the larger face of eachupright fa

Comentários a estes Manuais

Sem comentários