APC AR2901 Ficha Técnica Página 16

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 35
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 15
NetShelter VL Enclosure—Unpacking, Installation, and Customization 12
Removing and Installing the Roof
Removing the roof
1. Pull and hold the two spring pins in the rear of the enclosure.
2. Push the roof up from the enclosure.
3. Lift the roof off the enclosure.
Installing the roof
1. Slide the tabs on the front of the roof into the slots in the front of the enclosure.
2. Lower the roof into the enclosure, while pulling the two spring pins in the rear of the roof.
3. Release the pins to secure the roof to the enclosure.
Warning: To avoid damage or injury, do not use the roof as a walkway.
Note: The roof can be removed and reinstalled even if cables are routed through the top of the
enclosure.
ns1393a
Vista de página 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 34 35

Comentários a estes Manuais

Sem comentários