9 Site Preparation & Installation Guide Universal Transfer Switch UTS6 UTS6H UTS6BI UTS10BI
Hardwire the terminal block
Note: For easy installation, remove the terminal block from the UTS chassis.
1. Remove the two slotted nuts securing the terminal block to the UTS.
2. Slide the terminal block off the threaded studs.
3. Remove the knockout located on the right side of the UTS as you face it.
4. Install the strain relief cable clamp (supplied). Secure the clamp with the locknut (supplied).
Install the terminal block in the UTS
1. Slide the terminal block assembly over the two studs in the UTS. Secure the terminal block with two
slotted nuts removed previously.
2. Remove the nut from the ground terminal on the UTS chassis. Connect the ground wire to the ground
terminal on the chassis. Secure the ground wire with the nut removed previously. Torque to 11-13 in lbs.
3. UTS6/6BI/10BI models: Connect the power cable to a fixed generator or to a remote L14 connector used
for a portable generator.
UTS6H models: Connect the power cable to a fixed generator or to a remote L5 connector used for a
portable generator.
4. Install the UTS cover. Secure the cover to the UTS with the square drive screws removed previously.
5. To verify that the power cable is connected and functioning properly, start the generator and check that the
Generator LED on the UTS is illuminated.
6. Verify that all loads connected to the UTS are receiving power.
UTS6/6BI/10BI
Route the power cable through the strain relief installed
previously. Insert the white, red and black power cable
conductors into the terminal block assembly.
Tighten the screws. Torque to 10-16 in-lbs.
UTS6H
Route the power cable through the strain relief installed
previously. Insert the white and black power cable
conductors into the terminal block assembly.
Tighten the screws. Torque to 10-16 in-lbs.
White
Black
Terminal Block
UF Power Cable
White
Black
Terminal Block
UF Power Cable