990-2819 Smart-UPS® VT ISX 20-30 kVA, 208/220/480V Operation 17
Restart Procedure
Power application
Set the utility breaker to the ON position.
If your installation includes a Battery Enclosure with a DC disconnect switch, set the DC
disconnect switch to the ON position.
After system boot-up, the display will automatically prompt you on how to confirm/select voltage
and frequency as shown in the following.
Note
Start-up is included with the UPS, and the start-up procedure described here is only
applicable if the UPS requires a subsequent start-up.
Warning
Only trained personnel familiar with the construction and the equipment may
carry out the restart procedure.
Note
Wait approximately 30 seconds for the system to boot up and carry out self test.